888-888-8888 info@888.com

* MEASURING TOOL: MEASURING TAPE
* PS: FT= Feet
* Material: Pressure-treated
* Building code remarks: fencing posts have to position into a 4 ft deep hole, and pour in mixed concrete.

 

● Measure the full length of fence or the part(s) that you need to rebuild

A+B+C+D+E= FT

● How many gate(s) you need (gate size: 72 inch x 43 inch)


 

● Size of the post

 

 

● Height of the fence (standard is 6 feet)

 

● Choose the fencing style